    • 06:00 06:20
      Accelerator operation issues and how they have been addressed 20m

      Issues
      ** Beam size increase due to beam-beam
      ** Small dynamic aperture (short Touschek lifetime)
      ** Low injection efficiency (2nd bunch control, orbit jitter, emittance increase at BT, beam-beam, emittance increase at a larger charge at Linac)
      ** Poor stability and reproducibility
      ** Lack of monitors
      ** SBL
      Summary of the work during the last shutdown to address those issues

      Speaker: Kyo Shibata
    • 06:20 06:35
      Belle II operation issues and how they have been addressed 15m

      Issues:
      ** Beam background (detector performance, detector life, DAQ stability)
      ** Detector damage by SBL
      ** Lack of on-site experts
      Summary of the work during the last shutdown to address those issues

      Speaker: Katsuro Nakamura (KEK)
    • 06:35 06:55
      Accelerator operation status 20m

      Confirmed improvement by the work during the last shutdown
      Plan and result of 2025c run
      Issues in 2025c and how they have been addressed
      ** Hardware troubles and recovery procedures
      ** Physics run time less than 50%
      ** Lower injection efficiency than 2024c
      ** Lower specific luminosity than 2024c

      Speaker: Makoto Tobiyama
    • 06:55 07:15
      Accelerator operation plan 20m

      How to achieve 1/ab and 1 x 10^35 /cm^2/s
      ** How to reach LER > 2.0 A and HER > 1.4 A, issues to be addressed to reach it, and how to address it.
      ** How to keep 80% of physics run time and how to improve the accelerator operation efficiency
      Machine studies
      Plan ahead for possible issues and contingencies

      Speaker: Gaku Mitsuka
    • 07:15 07:35
      Mitigation plan for beam backgrounds and SBLs 20m
      • Collimator
      • Faster beam abort
      • PXD HV fast shutdown
      • Belle II HV emergency shutdown interlock for machine failure
      Speaker: Hiroyuki Nakayama (Belle (SuperKEKB Experiment))
    • 07:35 07:55
      Belle II operation status & plan 20m
      • Current status of the beam background, SBL, and DAQ
      • How the countermeasures for the issues are functioning in the operation
        or what improvements were confirmed during this run
      • Operation arrangements and expert staffing
      • Further improvements or implementation of remaining countermeasures
      • Detector studies
      • Strategy or criteria to turn on PXD
      Speaker: Kenta Uno (KEK)