The annual Belle II Trigger/DAQ workshop has been resumed.
The workshop is held in a hybrid-style with both face-to-face and remote connection.
The main topic of the workshop is to discuss target during RUN2 and the possible improvement and development for "Long Shutdown 2(LS2)", which as been extended to 2032. The discussion includes the application of machine learning for the automatic optimization of TRG/DAQ condition in beam, and the approach for the triggerless DAQ.